IKEA STORMCHAMBER

< back to projects

PROJECT NAME: IKEA Canberra ACT

SYSTEM REQUIRED: 902KL Detention System

UNIQUE CHALLENGES: To provide a Stormwater Detention system in the most cost efficient manner.

PROBLEMS SOLVED: QMax was able to provide a SPEL Stormchamber solution which eliminated the need of SW pipework and junction pits required for alternative systems.

OUTCOME: A very satisfied client with installation costs and timeframes kept to a minimum.