DATA CENTRE

< back to projects

TIME TAKEN: 6-8 weeks from order to delivery

SYSTEM REQUIRED: Emergency fire pump systems to ensure reliable supply of water to data centre. Pumpsets included a combination of mains water booster pumps along with a pumpset drawing water from a 400,000 litre tank. Tank pumpset is a dual diesel/electric pumpset to ensure reliable supply of water to hydrant and sprinkler systems, even in the event of a power failure or mains water failure.

UNIQUE CHALLENGES: Designing pumpsets to deliver required flow rates and head pressures and integrating the pump control panels to control pumps from a central pressure measuring point.

SOLUTION: QMax designed and engineered the pumpsets to conform to the design specification. After delivery and installation we carried out site flow testing and commissioned the pumps along with the fire brigade inspectors.