MANSFIELD ROAD - SOUTHERN HIGHLANDS, NSW

< back to projects

SYSTEM REQUIRED: The precast concrete pump station was a PPM 4500 with ABS Piranha PE30/2 grinder pumps, the pump station was fitted with Stainless Steel pipe work, lifting chains and Guide rails.

UNIQUE CHALLENGES: This pump station was designed and installed to the requirements of Wingecaribree Shire Council, complete with telemetry system and integration. The pump station was to be installed in very wet ground.

PROBLEMS SOLVED: QMax overcame those challenges by making a precast option the most effective solution, as installation time for the well was limited.